{"id":1662,"date":"2015-10-24T13:35:47","date_gmt":"2015-10-24T08:05:47","guid":{"rendered":"http:\/\/www.theteamwork.com\/articles\/?p=1662"},"modified":"2015-10-24T19:45:53","modified_gmt":"2015-10-24T14:15:53","slug":"2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications","status":"publish","type":"post","link":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html","title":{"rendered":"GNIDA Multistoried Flats Scheme 2012 &#8211; Construction Specifications"},"content":{"rendered":"<p><strong>GNIDA Multistoried Flats Scheme BHS-15\/2012 &#8211; Construction Specifications of the Flats<\/strong><\/p>\n<p>Greater Noida (Uttar Pradesh, India), October 24, 2015<\/p>\n<p>The Greater Noida Industrial Development Authority (GNIDA) had launched a residential scheme of multistoried flats (GNIDA Scheme Code BHS-15\/2012) in Greater Noida on August 15, 2012.<\/p><div data-ad-id=\"8601\" style=\"text-align:left; margin-top:px; margin-bottom:px; margin-left:px; margin-right:px;float:none;\" class=\"afw afw-ga afw_ad afwadid-8601  \">\r\n                                                                <script async=\"\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><ins class=\"adsbygoogle\" style=\"background:none;display:inline-block;width:300px;height:600px\" data-ad-client=\"ca-pub-7798450846111448\" data-ad-slot=\"6557536103\">\r\n                                                                <\/ins>\r\n                                                                <script>\r\n                                                                        (adsbygoogle = window.adsbygoogle || []).push({});\r\n                                                                <\/script>\r\n                                                                \r\n                                                        <\/div>\n<p><strong>The Construction Specifications of the GNIDA BHS-15 Flats<\/strong><\/p>\n<p>Foundation: Spread foundation in RCC isolated or combined, continuous wall footing with lean concrete and depth up to 1.2 meters below ground level<\/p>\n<p>Super Structure: RCC Framed structure with filler walls in brick work or load bearing construction in brick masonry with intermediate columns where found necessary and internal partition half brick masonry in cement mortar 1.4<\/p>\n<p>Window and Door Frames: Chalp or mirandi wood frames, pre-seasoned, termite proof, rebate, and shape as per drawings detail<\/p>\n<p>Window Shutters: Mirandi wood glazed and wire-mesh shutters, pre-seasoned complete with spirit polish\/enamel paint with all hardware fitting and stays as required<\/p>\n<p>Main Door Shutters: Double door, one with iron grill with wire mesh mosquito-proof, and other 35 cm thick flush Door with teak finish<\/p>\n<p>Other Doors Shutters: 30 mm thick ISI marked flush door shutter painted with enamel paint<\/p>\n<p>Fittings Hardware: Powder coated aluminum<\/p>\n<p>Peep Hole and Security Chain: Peep hole and security chain for external door only<\/p>\n<p>Flooring in Rooms, Internal Circulation Area: Vitrified tiles confirming to BIS standard<\/p>\n<p>Flooring in Kitchen: Anti skid ceramic tiles confirming to BIS standard<\/p>\n<p>Flooring in Common Circulation Area and Staircase: Kota stone flooring and matching skirting and in staircase, single piece kota stone shall be used<\/p><div data-ad-id=\"8683\" style=\"text-align:left; margin-top:px; margin-bottom:px; margin-left:px; margin-right:px;float:none;\" class=\"afw afw-ga afw_ad afwadid-8683  \">\r\n                                                                <script async=\"\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><ins class=\"adsbygoogle\" style=\"background:none;display:inline-block;width:336px;height:280px\" data-ad-client=\"ca-pub-7798450846111448\" data-ad-slot=\"3966003673\">\r\n                                                                <\/ins>\r\n                                                                <script>\r\n                                                                        (adsbygoogle = window.adsbygoogle || []).push({});\r\n                                                                <\/script>\r\n                                                                \r\n                                                        <\/div>\n<p>Kitchen Work Top: Granite stone<\/p>\n<p>Toilets: Ceramic tiles<\/p>\n<p>Skirting or Dado: Ceramic glazed tiles up to door height<\/p>\n<p>External Finishing: Tiles and textured paint combination<\/p>\n<p>Internal Finishing: All walls and ceiling to be painted with a coat of acrylic and oil bound distemper except kitchen, bath and WC and all ceiling, will be done with white wash. Synthetic enamel paint on all grill-work and steel work<\/p>\n<p><strong>The Last Date for Submission of Application Forms<\/strong><\/p>\n<p>The last date for submission of application forms for the GNIDA multistoried flats scheme BHS-15\/2012 was on September 14, 2012.<\/p>\n<p><a href=\"http:\/\/www.theteamwork.com\/articles\/2016-3851-greater-noida-industrial-development-authority-flats-scheme-2012.html\"><strong>Greater Noida Industrial Development Authority Flats Scheme 2012<\/strong><\/a><br \/>\nGreater Noida Industrial Development Authority &#8211; Multistoried Flats Scheme BHS-15\/2012<\/p>\n<p><a href=\"http:\/\/www.theteamwork.com\/articles\/2016-3801-greater-noida-industrial-development-authority-houses-scheme-2012.html\"><strong>Greater Noida Industrial Development Authority Houses Scheme 2012<\/strong><\/a><br \/>\nGreater Noida Industrial Development Authority &#8211; Independent Houses Scheme BHS-15\/2012<\/p>\n<p><a href=\"http:\/\/www.theteamwork.com\/articles\/2016-1064-greater-noida-industrial-development-authority-plans-projects.html\"><strong>Greater Noida Industrial Development Authority &#8211; Plans and Projects<\/strong><\/a><br \/>\nGreater Noida Industrial Development Authority -Current Residential Plans, Policies, Projects, and Schemes<\/p>\n<p><a href=\"http:\/\/www.theteamwork.com\/articles\/2016-1199-uttar-pradesh-awas-vikash-prishad-plans-projects.html\"><strong>Uttar Pradesh Awas Vikas Parishad &#8211; Residential Plans, Projects and Schemes<\/strong><\/a><br \/>\nUttar Pradesh Awas Evam Vikas Parishad &#8211; Current Residential Plans, Policies, Projects, and Schemes<\/p>\n<p><a href=\"http:\/\/www.theteamwork.com\/articles\/2016-2034-uttar-pradesh-government-plans-policies-projects.html\"><strong>Uttar Pradesh Government &#8211; Plans, Policies, and Projects<\/strong><\/a><br \/>\nGovernment of Uttar Pradesh &#8211; Current Residential Plans, Policies, Programs, Projects, and Schemes<\/p>\n<p><a href=\"http:\/\/www.theteamwork.com\/articles\/2016-2001-indian-government-plans-policies-projects.html\"><strong>Indian Government &#8211; Plans, Policies, and Projects<\/strong><\/a><br \/>\nGovernment of India \u2013 Current and Past Residential Plans, Policies, Programs, Projects, and Schemes<\/p>\n<div data-ad-id=\"8684\" style=\"text-align:left; margin-top:px; margin-bottom:px; margin-left:px; margin-right:px;float:none;\" class=\"afw afw-ga afw_ad afwadid-8684  \">\r\n                                                                <script async=\"\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script><ins class=\"adsbygoogle\" style=\"background:none;display:inline-block;width:336px;height:280px\" data-ad-client=\"ca-pub-7798450846111448\" data-ad-slot=\"2905808847\">\r\n                                                                <\/ins>\r\n                                                                <script>\r\n                                                                        (adsbygoogle = window.adsbygoogle || []).push({});\r\n                                                                <\/script>\r\n                                                                \r\n                                                        <\/div><\/p>","protected":false},"excerpt":{"rendered":"<p>Residential flats in GNIDA multistoried flats scheme BHS-15\/2012 will have construction with R.C.C. combined footings in foundation for bearing load, as per FAR with marble stone or tile flooring in rooms, granite stone and ceramic tiles in kitchen and toilets.<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[39],"tags":[1971,1974,1973,1944,343],"class_list":["post-1662","post","type-post","status-publish","format-standard","hentry","category-uttar-pradesh-government","tag-construction-specifications","tag-gnida-flats-scheme","tag-gnida-multistoried-flats-scheme","tag-gnida-scheme-2012","tag-multistoried-flats-scheme"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>GNIDA Multistoried Flats Scheme 2012 - Construction Specifications - Articles<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"GNIDA Multistoried Flats Scheme 2012 - Construction Specifications - Articles\" \/>\n<meta property=\"og:description\" content=\"Residential flats in GNIDA multistoried flats scheme BHS-15\/2012 will have construction with R.C.C. combined footings in foundation for bearing load, as per FAR with marble stone or tile flooring in rooms, granite stone and ceramic tiles in kitchen and toilets.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html\" \/>\n<meta property=\"og:site_name\" content=\"Articles\" \/>\n<meta property=\"article:published_time\" content=\"2015-10-24T08:05:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2015-10-24T14:15:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.theteamwork.com\/articles\/wp-content\/uploads\/2019\/12\/teamwork.gif\" \/>\n\t<meta property=\"og:image:width\" content=\"226\" \/>\n\t<meta property=\"og:image:height\" content=\"53\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/gif\" \/>\n<meta name=\"author\" content=\"Om Vishnu Bishnoi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@theteamw\" \/>\n<meta name=\"twitter:site\" content=\"@theteamw\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Om Vishnu Bishnoi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"GNIDA Multistoried Flats Scheme 2012 - Construction Specifications - Articles","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html","og_locale":"en_US","og_type":"article","og_title":"GNIDA Multistoried Flats Scheme 2012 - Construction Specifications - Articles","og_description":"Residential flats in GNIDA multistoried flats scheme BHS-15\/2012 will have construction with R.C.C. combined footings in foundation for bearing load, as per FAR with marble stone or tile flooring in rooms, granite stone and ceramic tiles in kitchen and toilets.","og_url":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html","og_site_name":"Articles","article_published_time":"2015-10-24T08:05:47+00:00","article_modified_time":"2015-10-24T14:15:53+00:00","og_image":[{"width":226,"height":53,"url":"https:\/\/www.theteamwork.com\/articles\/wp-content\/uploads\/2019\/12\/teamwork.gif","type":"image\/gif"}],"author":"Om Vishnu Bishnoi","twitter_card":"summary_large_image","twitter_creator":"@theteamw","twitter_site":"@theteamw","twitter_misc":{"Written by":"Om Vishnu Bishnoi","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html#article","isPartOf":{"@id":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html"},"author":{"name":"Om Vishnu Bishnoi","@id":"https:\/\/www.theteamwork.com\/articles\/#\/schema\/person\/f374d368393522341e8fb047b101a0fa"},"headline":"GNIDA Multistoried Flats Scheme 2012 &#8211; Construction Specifications","datePublished":"2015-10-24T08:05:47+00:00","dateModified":"2015-10-24T14:15:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html"},"wordCount":467,"commentCount":0,"publisher":{"@id":"https:\/\/www.theteamwork.com\/articles\/#organization"},"keywords":["Construction Specifications","GNIDA Flats Scheme","GNIDA Multistoried Flats Scheme","GNIDA Scheme 2012","Multistoried Flats Scheme"],"articleSection":["Uttar Pradesh Government"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html","url":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html","name":"GNIDA Multistoried Flats Scheme 2012 - Construction Specifications - Articles","isPartOf":{"@id":"https:\/\/www.theteamwork.com\/articles\/#website"},"datePublished":"2015-10-24T08:05:47+00:00","dateModified":"2015-10-24T14:15:53+00:00","breadcrumb":{"@id":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.theteamwork.com\/articles\/2016-3900-gnida-multistoried-flats-scheme-2012-construction-specifications.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.theteamwork.com\/articles"},{"@type":"ListItem","position":2,"name":"GNIDA Multistoried Flats Scheme 2012 &#8211; Construction Specifications"}]},{"@type":"WebSite","@id":"https:\/\/www.theteamwork.com\/articles\/#website","url":"https:\/\/www.theteamwork.com\/articles\/","name":"Articles","description":"Latest, Informative, Exclusive, Original Content","publisher":{"@id":"https:\/\/www.theteamwork.com\/articles\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.theteamwork.com\/articles\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.theteamwork.com\/articles\/#organization","name":"Teamwork","url":"https:\/\/www.theteamwork.com\/articles\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.theteamwork.com\/articles\/#\/schema\/logo\/image\/","url":"https:\/\/www.theteamwork.com\/articles\/wp-content\/uploads\/2019\/12\/teamwork.gif","contentUrl":"https:\/\/www.theteamwork.com\/articles\/wp-content\/uploads\/2019\/12\/teamwork.gif","width":226,"height":53,"caption":"Teamwork"},"image":{"@id":"https:\/\/www.theteamwork.com\/articles\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/x.com\/theteamw"]},{"@type":"Person","@id":"https:\/\/www.theteamwork.com\/articles\/#\/schema\/person\/f374d368393522341e8fb047b101a0fa","name":"Om Vishnu Bishnoi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/0feb360c191efc6c3a247cf3a665e1c6f1bf8497c24f4365e133e4dc26506db3?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/0feb360c191efc6c3a247cf3a665e1c6f1bf8497c24f4365e133e4dc26506db3?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/0feb360c191efc6c3a247cf3a665e1c6f1bf8497c24f4365e133e4dc26506db3?s=96&d=mm&r=g","caption":"Om Vishnu Bishnoi"},"url":"https:\/\/www.theteamwork.com\/articles\/author\/andrew-collins"}]}},"_links":{"self":[{"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/posts\/1662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/comments?post=1662"}],"version-history":[{"count":0,"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/posts\/1662\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/media?parent=1662"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/categories?post=1662"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.theteamwork.com\/articles\/wp-json\/wp\/v2\/tags?post=1662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}